Layanan Banner new
GCG Structure & Policies
Breadcrumb
Corporate Governance - GCG Structure & Policies
Overseeing the Culture and Digital Transformation that have been carried out since 2021, BRI further strengthens the role of Governance as the basis for developing and implementing the company’s business through increasing employee awareness, improving systems, and updating policies. Enhanced implementation of BRI’s Good Corporate Governance has received recognition from various parties so that BRI is ranked as the Most Trusted Company in Corporate Governance Perception Index from The Indonesian Institute for Corporate Governance.
- GCG Principles
- GCG Policies
- Anti-Bribery and Anti-Corruption
- Procurement Policy
- Tax Strategy
- Whistleblowing Policy
In increasing sustainable corporate value, BRILiaN people are committed to implementing the principles of GCG in improving company performance in the corridor of sustainable governance.
GCG implementation at BRI applies 5 (five) principles of good corporate governance: transparency, accountability, responsibility, independence, and fairness.
Formulation of GCG principles to Support BRI’s Sustainable Business Activities
Transparency
- The Bank disclosed information in a timely, accurate, adequate, clear and comparable manner and can be accessed by interested parties (stakeholders) in accordance with their interests and rights.
- The Bank has a policy to disclose important information required by the stakeholders
- The Bank discloses information in accordance with prevailing laws and regulations including the Bank’s vision and mission, business values and targets and strategies, financial condition, composition and remuneration of the Board of Commissioners and Board of Directors, controlling shareholder, organizational structure, risk management, internal control system, and implementation of GCG and compliance.
- The principle of information disclosure continued to pay attention to statutory provisions along with Bank and Customer confidential information.
Accountability
- The Bank establishes long-term and short-term business targets that are accountable to shareholders and stakeholders
- The Board of Commissioners and the Board of Directors submit the annual report and financial accountability in the GMS
- The Bank submits the report in accordance with the applicable provisions to the supervisory authority of the Bank and other stakeholders as applicable
- The Bank shall determine the duties and responsibilities of the Board of Commissioners, Board of Directors and corporate organs as well as their subordinates in line with the Bank’s vision and mission.
- The Bank ensures on the availability of competencies of the Board of Commissioners and the Board of Directors as well as all levels below in accordance with their responsibilities and understands their role in GCG implementation.
- The Bank ensures on the availability of structures, systems and SOPs that can ensure the operation of check and balance mechanism in achieving the Bank’s vision and mission.
- The Bank has an effective internal control system.
Responsibility
- The Bank adheres to the principles of prudence and guarantees the enforcement of regulations, articles of association and internal regulations of the Bank.
- The Bank maintains nature conservation through lending policy and other policies that support the natural resources preservation.
- The Bank acts as a good corporate citizen through social and environmental responsibility.
Independency
- The Bank avoids the dominance of any party, unaffected by certain interests, free of conflict of interest and any influence or pressure so as to act objectively
- The Bank performs its functions and duties in accordance with the Articles of Association, internal Bank rules and regulations.
Equality and Fairness
- The Bank provides fair and equal behavior to the stakeholders in accordance with the benefit and contribution made to the Bank.
- The Bank provides opportunities for stakeholders to provide input and convey opinions for the interests of the Bank and access to information disclosure.
Bank BRI’s governance soft structure includes:
- Articles of Association contained in Deed No. 3 dated March 9, 2021 as last amended by Deed No. No. 4th of October 6, 2021.
- Joint Decree of the Board of Commissioners and Directors No. 06-KOM/BRI/12/2013 and Nokep: S.65-DIR/DKP/12/2013 dated December 16, 2013 concerning the BRI Code of Ethics.
- Joint Decree of the Board of Commissioners and Directors No. 02-KOM/02/2020 and No. 01-DIR/KPT/02/2020 dated February 17, 2020 concerning the Good Corporate Governance Policy of PT Bank Rakyat Indonesia (Persero) Tbk.
- Joint Decree of the Board of Commissioners and Directors No. 06-KOM/BRI/07/2015 and No. S.339-DIR/DKP/07/2015 dated July 28, 2015 concerning Guidelines for Integrated Governance of the Financial Conglomerate of PT Bank Rakyat Indonesia (Persero) Tbk.
- Joint Decree of the Board of Commissioners and Directors No. 09-KOM/BRI/11/2017 and No. S.1023-DIR/KPS/11/2017 dated November 30, 2017 concerning the Remuneration Governance Policy of PT Bank Rakyat Indonesia (Persero) Tbk.
- Decree of the Board of Commissioners No. 09-KOM/11/2018 dated November 1, 2018 concerning the Board of Commissioners Rules of Conduct.
- Decree of the Board of Commissioners No. 11-KOM/11/2018 dated November 1, 2018 concerning Guidelines for Audit Committee Rules.
- Decree of the Board of Commissioners No. 12-KOM/11/2018 dated November 1, 2018 concerning the Rules of Procedure of the Risk Management Monitoring Committee.
- Decree of the Board of Commissioners No. 13-KOM/11/2018 dated November 1, 2018 concerning the Rules of Procedure for the Nomination and Remuneration Committee.
- Decree of the Board of Commissioners No. 14-KOM/11/2018 dated November 1, 2018 concerning the Guidelines for the Integrated Governance Committee.
- Board of Directors Decree Number KB.01-DIR/MAT/03/2020 dated March 31, 2020 concerning Policies for Fixed Assets and Logistics Management of PT Bank Rakyat Indonesia (Persero) Tbk.
- Board of Directors Decree No. B.299-DIR/SKP/04/2020 dated April 24, 2020 concerning Stipulation of Guidelines and Work Procedures for Directors of PT Bank Rakyat Indonesia (Persero) Tbk.
- Board of Directors Decree No. B.242-DIR/SKP/03/2020 dated March 30, 2020 regarding the Stipulation of Guidelines and Rules of Procedure for the Board of Directors Meeting of PT Bank Rakyat Indonesia (Persero) Tbk.
- Board of Directors Decree Number 166-DIR/KPD/04/2022 dated April 19, 2021 concerning Corporate Governance Guidelines.
- Board of Directors Decree No. B.1784-DIR/CSC/CSM/10/2022 dated October 31, 2022 regarding the Stipulation of Guidelines and Rules of Procedure for the Board of Directors Meeting of PT Bank Rakyat Indonesia (Persero) Tbk.
- Board of Directors Circular No. SE.63-DIR/KEP/12/2020 dated December 8, 2020 concerning Provisions on Anti-Bribery and Gratification Control of PT Bank Rakyat Indonesia (Persero) Tbk.
- Board of Directors Circular No. SE.65-DIR/KEP/10/2021 dated October 28, 2021 concerning the Whistleblowing System.
- Board of Directors Circular No. SE.08.DIR/KEP/02/2022 dated February 17, 2022 concerning Implementation of the AntiMoney Laundering (APU) & Prevention of Terrorism Financing (PPT) Program.
- Board of Directors Circular No. SE.11-DIR/KEP/03/2022 dated March 4, 2022 concerning Assessment of the Risk Level of Money Laundering and/or Terrorism Financing Crimes (TPPU and/or TPPT) Based on a Risk Based Approach.
- Board of Directors Circular No. SE.27-DIR/KEP/04/2022 dated April 18, 2022 concerning Handling of Conflicts of Interest of PT Bank Rakyat Indonesia (Persero) Tbk.
- Board of Directors Circular No. SE.28-DIR/KPD/05/2022 dated May 13, 2022 concerning Management of Policies and Procedures.
- Board of Directors Circular No. SE. 38-DIR/PPM/06/2022 dated June 23, 2022 concerning Corporate Strategy (Book 2 RBB).
- Board of Directors Circular No. SE.58-DIR/ORD/11/2022 datedNovember 22, 2022 concerning Guidelines for Implementing Operational Risk Management (Book 5 AntiFraud Strategy).
- Standard Operating Procedure No. SO.79-KEP/12/2021 dated February 28, 2021 concerning Application of Anti-Money Laundering and Counter of Terrorism Financing (AML & CFT) in Operational Work Units.
Introduction
PT Bank Rakyat Indonesia (Persero) Tbk (BRI) is firmly committed to upholding integrity, transparency, and accountability in all aspects of its operations. This commitment is demonstrated under Circular Letter No. NOSE.09-DIR/KEP/03/2023 dated 31 December 2024 concerning Corporate Governance along with its amendment endorsed by Directors. The Circular letter reinforces the Bank’s zero-tolerance policy toward bribery and its dedication to ethical business conduct also implements good corporate governance through all BRI’s activities and set the policy toward Conflict of interest, whistleblowing system, Asset Declaration Report for State Officials, Anti-bribery and anti-corruption, Anti-Bribery Management System ISO 37001:2016, code of conducts, as well as good corporate governance.
BRI has taken necessary actions to prevent conflicts of interest by implementing clear policies and procedures that regulate employee conduct and decision-making. These measures are designed to ensure that all business activities are carried out objectively and free from personal interests that may influence professional judgment. Through periodical awareness programs, internal controls, disclosure mechanisms, and individual commitment BRI reinforces a culture of integrity and accountability across all levels of the organization.
Definition
Bribery is the act of offering, promising, giving, receiving, or soliciting any undue advantage of any value (whether financial or non-financial), either directly or indirectly, regardless of location, which constitutes a violation of laws and regulations, as an inducement or reward for a person to perform or refrain from performing an act in relation to the performance of their duties.
Conflict of Interest refers to a situation where there is a divergence between the economic interests of the company and the personal economic interests of members of the Board of Directors, members of the Board of Commissioners, major shareholders, or controlling parties — including, but not limited to, any employee — that may potentially harm the company
Corruption is defined as any unlawful act committed by a person to enrich themselves, another individual, or a corporation, which may cause losses to the state’s finances or economy. This definition is in accordance with Law No. 31 of 1999 concerning the Eradication of Corruption Crimes.
Gratification refers to any form of gift or benefit in a broad sense, including the provision of money, goods, discounts, commissions, interest-free loans, travel tickets, accommodation facilities, leisure trips, free medical treatment, and other facilities—whether received domestically or abroad, and whether conducted through electronic means or otherwise. Any form of gratification shall be considered a bribe if it is related to the recipient’s official duties and is contrary to their obligations or responsibilities.
Leadership and Commitment
BRI affirms its unwavering commitment to uphold standards of integrity, ethics, and good governance across all levels of the organization. The Board of Commissioners, Board of Directors, SEVP, and all employees consistently commit to:
- Reject, prevent, and avoid any actions that violate or contradict their duties and authority under the Company’s Articles of Association or applicable laws and regulations that may harm the Company.
- Adhere to the highest standards of ethical and moral conduct by demonstrating fairness, transparency, consistency, honesty, and integrity in all actions and decisions.
- Enforce a zero-tolerance policy toward all forms of fraud—both internal and external — including bribery and gratification. Any individual found to have engaged in fraudulent activities shall be held fully accountable and subject to disciplinary action and legal sanctions in accordance with applicable laws and regulations.
- Foster a work environment free from Corruption, Collusion, and Nepotism in any form, by any individual, company, or institution related to the execution of their duties.
- Instruct all BRILiaN personnel to consistently apply the Code of Conduct, principles of Good Corporate Governance (GCG), risk awareness, compliance culture, anti-bribery management, and internal controls in all aspects of their work.
This commitment is formalized through an Integrity Pact signed annually by the Board of Commissioners and Board of Directors, as well as by all business unit leaders and employees.
Risk Management
BRI identifies and assesses risks and opportunities related to the implementation of the AntiBribery Management System as part of its commitment to continuously improving business processes. This process is documented through the Bribery Risk Assessment Form, which outlines how risks are controlled to minimize their likelihood and potential impact, while ensuring that opportunities are managed to maximize positive outcomes. The identification of risks and opportunities aims to ensure the effectiveness of the Anti-Bribery Management System, increase the likelihood of achieving desired outcomes, reduce potential adverse impacts, and support ongoing improvement.
Each business unit, as the designated risk owner, is responsible for identifying bribery-related risks and opportunities and for planning appropriate controls. The results of these controls are then submitted to the Anti-Bribery Compliance Function, which verifies the timeliness and effectiveness of their implementation in accordance with the applicable scope and internal guidelines.
Anti-Bribery Policy
BRI has established, maintained, and continuously reviewed its Anti-Bribery Policy under the supervision of the Board of Commissioners and the Board of Directors. The policy reflects the Company’s adherence to the Anti-Bribery Management System and promotes awareness among employees to report any violations in good faith or based on reasonable belief, without fear of retaliation. It also emphasizes continuous improvement and outlines the authority and independence of the Anti-Bribery Compliance Function, including consequences for noncompliance.
Anti-Corruption Policy
Aligned with the Company’s core value of Amanah, which emphasizes integrity, honesty, sincerity, and regulatory compliance, BRI’s Anti-corruption policy ensures our stance of anti-corruption, collusion, and nepotism. It prohibits the solicitation, acceptance, or offering of unauthorized gratification, mandates avoidance of conflicts of interest, and requires all violations to be reported through established company mechanisms.
Charitable contributions, gifts, hospitality and Comparable Advantages Guideline
BRI is firmly committed to maintaining the highest standards of integrity and transparency by prohibiting the giving or receiving of charitable contributions (donations), gifts, hospitality and Comparable Advantages Guideline intended to influence decisions or provide unfair advantage. This principle is embedded in the company’s Code of Conducts, Anti-Bribery and Gratification Control Policy, and further supported by regulations governing the Environmental Development Program and Sponsorship Funding. These frameworks align with Indonesia’s Corruption Eradication Commission (KPK) Circular No. 19 of 2021 on Gratification Control in the Financial Services Industry and clearly define acceptable practices, including the reporting and handling of excluded gratifications.
Prohibition of Involvement in Political Activities
BRI personnel are required to refrain from using their time, funds, or personal resources to support or participate in any form of political activity, in accordance with applicable corporate policies and regulations. This includes participating in the election of legislative or executive candidates, becoming members of political parties, or engaging with organizations or individuals that aim to support political parties or candidates. Additionally, they are prohibited from taking part in political campaigns, fundraising efforts for political causes, or any activities intended to support political participation. Engagement in political party activities or other similar endeavors is strictly prohibited to maintain the integrity and neutrality of the institution.
Support
BRI provides the necessary resources to implement, maintain, and improve the Anti-Bribery Management System. These resources include people, infrastructure, work environment, and knowledge—sourced internally or externally as needed. It also ensures that the Anti-Bribery Compliance Function has the required support, including budget, infrastructure, and qualified staff, to carry out its duties effectively.
Communication and Training
To enhance awareness of Anti-Bribery and Anti-Corruption within the company, these principles are incorporated into the Company’s Code of Conducts and the BRILiaN Employee Code of Conduct. To support ongoing understanding, BRI conducts periodical education and awareness programs each year through both in-person sessions and/or e-learning. These efforts help ensure that all employees review and sign the annual Anti-Bribery and Anti-Corruption commitment. Furthermore, to enhance transparency, all employees are required to sign the Code of Conduct and declare any potential conflicts of interest through the completion of an annual conflict of interest disclosure.
Performance Evaluation
As part of the performance evalation of good corporate governance, BRI has set an internal and/or external control for the policy. This includes the identification and assessment of significant risks, the enforcement of effective control mechanisms, the application of appropriate segregation of duties across the organization and all aspects of Anti-bribery Management system.
As part of the Company’s commitment to strengthening corporate governance, regular reviews of the Anti-Bribery Management System implementation are conducted by Senior Management, the Steering Committee, and the Anti-Bribery Compliance Function. These reviews aim to ensure the effectiveness of the system, alignment with established policies and objectives, adequacy of resources, and proper handling of potential violations. All evaluation processes are duly documented as a reflection of the Company’s commitment to integrity and compliance.
Investigation and Handling Guidelines
BRI promotes anti-bribery awareness by encouraging employees to report any suspected or actual bribery in good faith through the Whistleblowing System (WBS), which ensures confidentiality and protection for whistleblowers. All reports, whether involving internal or external parties, are handled according to established procedures. Investigations are conducted by the Investigation Unit in line with the Anti-Fraud Strategy and WBS policies. Proven cases of bribery result in appropriate sanctions, and outcomes are reported to the Anti-Bribery Compliance Function and escalated to Senior Management and the Steering Committee.
To demonstrate its commitment to complaint handling, the management of the Whistleblowing System (WBS) is carried out by an independent party. The Policy is communicated across the organization and relevant stakeholders. This effort aims to uphold a clean and corruption-free corporate environment and is subject to ongoing review to ensure alignment with BRI’s ethical commitments.
Punishment
Any violation of this commitment shall be subject to sanctions in accordance with prevailing laws and regulations.
Continual Improvement
Corrective actions are carried out to eliminate the causes of nonconformities and to prevent their recurrence. This includes taking necessary control and remedial measures, as well as addressing any consequences resulting from the nonconformity. The process involves evaluating actions needed to eliminate the root causes by reviewing and analyzing the nonconformity and assessing the likelihood of recurrence. All documented evidence related to corrective actions must be properly maintained.
BRI identifies and pursues opportunities for improvement that include strengthening the control measures within its Anti-Bribery Management System in line with applicable regulations, mitigating or preventing potential adverse impacts, and enhancing the overall performance and effectiveness of the system across the organization.
The procurement of good and services carried out by BRI aims to support bank operations and business performance in general. In an effort to provide the best service and heed the principles of Good Corporate Governance, BRI is determined to create a process of procurement of goods and services that is safe, effective and efficient.
The General Policy of Fixed Asset and Logistic Management (KEMAL) is a guideline in carrying out the process of Procurement of goods and services to support the Bank’s operational activities in accordance with the quality, quantity and time set at the best price while still observing Good Corporate Governance principles.
The objectives of the compilation of KEMAL BRI are:
- As a guideline in managing fixed assets and quality logistics services for all BRI work units.
- As a guideline in the process of procurement of goods and services at BRI so that the procurement process at BRI.
Principle of Good and Services Procurement
-
Efficient
Procurement of goods and / or services must be endeavored to obtain optimal and best results in a short time by using the funds and the minimum capacity to be reasonable and not only based on the lowest price. -
Effective
Procurement of goods and / or services must be in accordance with predetermined needs and provide maximum benefits according to the targets set. -
Competitive
Procurement of goods and / or services must be open to providers of goods and / or services that meet the requirements and carried out through fair competition among providers of goods and / or services that areequal and meet certain requirements / criteria based on clear and transparent provisions and procedures. -
Transparent
All provision and information regarding the procurement of goods and / or services, including technical requirements for procurement administration, evaluation procedures, evaluation results, determination of prospective providers of goods and / or services, are open to participants who are interested in providing goods and / or services. -
Fair and equal
Provide equal treatment for all prospective suppliers of goods and services that meet the requirements. -
Accountable
Must achieve goals and be accountable so as to keep away from potential abuse and irregularities.
Good and Service Procurement Procedure
The stages of implementing the procurement of goods and services at BRI are carried out as follows:
- In order to support operational activities, BRI requires adequate facilities and infrastructure to achieve the Company’s objectives. A procurement process is required to fulfill facilities, infrastructure and infrastructure.
- In each implementation of the procurement process, it is necessary to determine the Self Estimated Price as one of the bases in determining the method of procurement. In 2017 an Estimation Group was formed, namely an independent work unit that has the duties and responsibilities in preparing and stipulating the HPS for the procurement of goods and / or services at BRI.
- The procurement process can be carried out with several methods, including Swakelola, direct purchase, direct appointment, direct election and open auction.
- In the procurement process an evaluation of the offer submitted by the prospective Provider of Goods / Services will be carried out to obtain the best quality and price.
- In order to obtain conformity between the needs of BRI and the bids submitted by prospective suppliers of goods / services, Clarification and Negotiation will be carried out in the procurement process until the winner of the goods / service provider is determined.
- If a winner has been determined, BRI provides a refutation time if there are parties who object to the procurement process that has been carried out or to the winner’s determination. This is done by BRI in order to realize the process of procurement of goods and services that meet the rules of Good Corporate Governance.
Partner Management
The stages of implementing the procurement of goods and services at BRI are carried out as follows:
- Providers of good and/or services which will participate in the procurement of good and / or services in BRI need to have a BRI Registration Certificate (TDR). TDR (Partner Register) is a statement in the format of a certificate or letter explaining that the provider of good / services is listed therein has been registered as a BRI Partner, as a condition for participating in the procurement of good / services at BRI.
- BRI has a list of suppliers of good/ services that can be used in the process of procuring goods/services at BRI. The list of partners is obtained from the selection of qualifications and requirements determined by BRI. Supplier selection process to consider the legality of the company (not limited to Hinderordonnantie (HO), Environmental impact assessment /AMDAL), the financial aspects, (the company's financial statements) and non-financial, among others related to labor and human factors. The partner selection process is carried out transparently and applies the GCG principles.
-
The requirements set for the partners of BRI has been done in accordance pinsip procurement such as:
- Have a valid business legality
- Financial performance report partner in both categories
- Having the experience of the field work to be done.
- Partner Management Application. BRI has developed application management TDR (Associate Registration) that is integrated with BRISMILE starting from partner registration conducted independently by vendors (via BRI intranet), legality and vendor business evaluation process to issuance of BRI Partner Signs (BRI TDR) by BRI.
As a public company with more than 40% public ownership of its shares, PT Bank Rakyat Indonesia (Persero) Tbk is committed to carrying out its tax obligations following applicable regulations.
Key Tax Principle
In accordance with the provisions of the applicable tax laws, BRI consistently applies tax principles to its tax management implementation.
1) Compliance with tax laws and regulations in different jurisdictions
In their operational activities, BRI and its overseas branch offices have implemented good corporate governance that is carried out transparently and accountably, especially in managing their tax rights and obligations following the provisions of the applicable tax laws in each country.
On May 18, 2020, the Government issued Law Number 2 of 2020 concerning Enactment of Government Regulation in Lieu of Law Number 1 of 2020 concerning State Financial Policy and Financial System Stability For The Handling Of COVID-19 Pandemic and/or in the Framework of Dealing with Threats Endangering the National Economy and/or Financial System Stability Becomes Law, and enact Government Regulation No. 30 of 2020 concerning Reduction of Income Tax Rates for Domestic Entity Taxpayers in the Form of a Public Company and effective from the date of promulgation, namely on June 19, 2020. Furthermore, on October 29, 2021, the Government issued Law of the Republic of Indonesia Number 7 of 2021 concerning Harmonization of Tax Regulations.
The regulation has stipulated, among other things, a reduction in the income tax rate for domestic corporate taxpayers and permanent establishments from previously 25% to 22% for the fiscal years 2020, 2021, and 2022 onwards, as well as a further reduction in the tax rate of 3%, for domestic taxpayers who meet specific requirements such as a publicly listed company that satisfy a minimum listing requirement of 40% and certain other conditions.
Bank BRI has met the requirements to get an incentive to reduce the tax rate by 3% based on the provisions of Article 5 paragraph (2) of Law No. 2 of 2020 so that for 2021 Bank BRI will use a tax rate of 19% in the calculation of Corporate Income Tax.
2) Tax Risk Management and Information Disclosure
Tax-related policies and their implementation are approved and reviewed by the Director of Finance in reporting the Annual Corporate Income Tax Return. The Director of Finance reviews the strategy and performance of this tax obligation annually. Bank BRI always strives to comply with applicable tax regulations.
Introduction
PT Bank Rakyat Indonesia (Persero) Tbk (BRI) is committed to upholding the principles of integrity, transparency, and accountability across all aspects of its operations. This commitment is articulated in Circular Letter No. NOSE.09-DIR/KEP/03/2023, dated March 15, 2023, regarding corporate governance, along with its subsequent amendment as approved by the Board of Directors.
As part of its ethical business practices, BRI has implemented a Whistleblowing System (WBS), which enables employees, business partners, customers, and other stakeholders to report suspected misconduct occurring within BRI’s Work Units in good faith, through accountable and reliable channels that prioritize confidentiality and protection for the whistleblower.
The WBS facilitates the detection and prevention of unethical or unlawful behavior, including fraud, corruption, abuse of authority, and other forms of misconduct. All reports submitted through the system are treated with the utmost seriousness and independence, and whistleblowers are protected from any form of retaliation.
The development of the WBS is guided by the following regulatory frameworks:
- Regulation of the Minister of SOEs No.PER-2/MBU/03/2023 dated 24 March 2023 on Guidelines for Corporate Governance and Significant Corporate Actions of State-Owned Enterprises.
- OJK Regulation No. 55/POJK.04/2015 dated 23 December 2015 on the Establishment and Implementation Guidelines of Audit Committees.
- OJK Regulation No. 17/POJK.03/2023 dated 14 September 2023 on Governance Implementation for Commercial Banks.
- OJK Regulation No.12/POJK.03/2024 dated 23 July 2024 on Implementation of Anti-Fraud Strategies for Commercial Banks.
Governance and Oversight
The Whistleblowing System (WBS) is managed by an independent function to ensure impartiality, confidentiality, and the timely handling of reports. This function is responsible for receiving, verifying, escalating, and monitoring whistleblower reports in accordance with internal procedures and applicable regulatory standards.
The system operates under strong governance, with regular oversight by the Board of Directors and the Audit Committee, in accordance with good corporate governance principles. To ensure its continued effectiveness and relevance, the WBS policy is subject to periodic review and improvement. Any amendments must be approved by the Board of Directors and communicated to relevant stakeholders.
Scope of Reportable Wrongdoings
BRI’s Whistleblowing System (WBS) is designed to receive and follow up on reports of alleged violations that may threaten the company’s integrity, compliance, reputation, or financial soundness. Reportable acts include, but are not limited to:
- Corruption, extortion, bribery, and unlawful receipt of benefits (illegal gratuities).
- Misuse of company assets, including cash, inventory, credit facilities, deposits, and other resources.
- Financial reporting fraud within BRI.
- Fraudulent activities of any kind.
- Unauthorized disclosure of confidential information.
- Other actions equivalent to fraud.
- Ethical violations, including use of illegal drugs, human rights violations, involvement in prohibited community activities, engagement in political activities, and violations of the Respectful Workplace Policy, which include discrimination, violence, harassment, and any other disrespectful behavior toward fellow employees.
Reporting Mechanisms & Channels
BRI provides a range of secure reporting channels, managed by an independent third-party service provider (currently Deloitte, to ensure transparency, accessibility, and impartiality throughout the whistleblowing process. These channels are available to all stakeholders -both internal and external- and support full, partial, or anonymous disclosure.
Reports can be submitted through the following means:
- Website: https://idn.deloitte-halo.com/bri-whistleblowingsystem
- Email: bri-whistleblowingsystem@tipoffs.info
- SMS/WhatsApp: +6281181135306
- Po BOX: 1450 JKP 10014
BRI encourages whistleblowers to provide complete and factual information to facilitate accurate follow-up and investigation. Each report will be assigned a reference number and access code to allow secure tracking of the report’s status.
BRI guarantees the following:
- Full protection of whistleblower identity (if disclosed).
- Respect for anonymous submissions.
- Access to information is strictly limited to authorized personnel.
- A full commitment to protecting whistleblowers from any form of retaliation.
Handling Process & Investigation
All violation reports received through official channels are managed by an independent consultant and the WBS Administrator, ensuring objectivity, confidentiality, and accountability throughout the entire handling process. The report handling process consists of the following stages:
- Screening & Initial Verification
Initial screening and verification of reported violations are conducted by the appointed independent consultant responsible for managing the whistleblowing system. Once this initial process is completed, verified reports are forwarded to the WBS administrator for further action. - Report Classification
Received reports are classified into two main categories: corruption-related and non-corruption-related. For reports indicating alleged acts of corruption, prior approval from the President Director is required before the case can be escalated to the competent external authorities, in accordance with applicable laws and regulations. - Investigation Assignment & Timeline
Valid reports are assigned to the appropriate investigative unit (e.g. SKAI or Human Capital) for follow-up. The designated unit conducts fact-finding activities either onsite or offsite. The WBS Administrator issues an official acknowledgment of the report within five working days. Investigations are expected to be completed within twenty working days, with a possible extension of up to sixty working days for complex cases. - Protection of Rights During the Process
The rights of both the whistleblower and the reported party are protected throughout the process. The reported individual is presumed innocent (presumption of innocence) and retains the right to respond to the allegations. - Investigation Outcome Reporting
The results of the investigation are documented and submitted to the WBS Administrator. If the violation is substantiated, appropriate remedial actions will be recommended. If the report is unsubstantiated, the WBS Administrator will inform the direct supervisor of the reported individual to safeguard their reputation. - Corrective Action
The relevant work unit is responsible for implementing the recommended corrective actions and reporting their completion to the investigative team. Final evaluation is conducted by the investigative team and reported to the WBS Administrator.
Protection & Support for Whistleblowers
BRI is committed to providing full protection to whistleblowers who submit reports in good faith. This commitment includes the following measures:
-
Non-Retaliation
Whistleblowers are protected from any form of threat, intimidation, discrimination, demotion, termination of employment, or other adverse consequences arising from the act of reporting. Any violation of this non-retaliation policy will be subject to disciplinary sanctions in accordance with applicable internal regulations. -
Confidentiality
The identity of the whistleblower and the content of the report are strictly protected and are accessible only to authorized personnel. Unauthorized disclosure of the whistleblower’s identity or report content is considered a serious violation and may result in disciplinary action, including termination, in line with internal policies and applicable laws. -
Support
BRI may provide additional support, including legal protection, in accordance with internal procedures, if the whistleblower is subjected to retaliatory actions. -
Accountability for False Reports
Whistleblowers who intentionally submit false reports or act with malicious intent may be subject to disciplinary action, as outlined in the company’s disciplinary code. -
Recognition
Whistleblowers whose reports are proven valid, who are not involved in the reported violation, and who disclose their identity at the time of reporting will be eligible to receive formal recognition, such as a certificate of appreciation, sent via email.
Training & Awareness
To support the effective implementation of the Whistleblowing System (WBS), BRI regularly conducts training and awareness programs aimed at raising awareness and fostering a strong speak-up culture across the organization. All employees are required to participate in periodic training and refresher sessions, delivered through both e-learning modules and in-person sessions.
BRI also maintains ongoing internal communication through various channels such as posters, intranet content, and other visual media to ensure that WBS procedures and reporting channels remain visible and easily accessible at all times. In addition, BRI communicates the availability of reporting mechanisms to vendors, business partners, and other external stakeholders to promote ethical conduct throughout BRI’s business ecosystem. The effectiveness of these training and awareness activities is evaluated on a regular basis to ensure they contribute meaningfully to increased awareness and compliance.